Transformation program · Case study 05
Lean Manufacturing Transformation
Led cross-functional Lean and just-in-time transformation across manufacturing lines, engineering, supply chain, and production operations.
ORGANIZATIONRheem Manufacturing
01 · Challenge
The situation
Accelerate production readiness while eliminating waste, resolving design constraints, and aligning work to the Factory Master Plan.
02 · Leadership
The approach
Directed Kaizen events, pre-production builds, design and BOM issue resolution, and coordinated execution across engineering and manufacturing teams.
03 · Outcome
The result
Completed transformation milestones two months ahead of plan and generated more than $1.5M in savings.
CAPABILITIES DEMONSTRATED
How the work was delivered.
- Lean transformation
- Kaizen
- Cross-functional delivery
- Cost reduction